Skip to content
Fredrin

#general

Feature request: Would it be possible to switch the provider/model in mid-build, when running into a…

Christian Koch, CODE K@code-K·

Feature request: Would it be possible to switch the provider/model in mid-build, when running into a weekly limit or so? Then i would like to be able to switch from codex to claude etc. and continue. 🙏

4replies
Jae LeeTeam@jaequery·

Thats a good idea, let us noodle on that.

Christian Koch, CODE K@code-K·

great! <3

Jae LeeTeam@jaequery·

Hi Christian — we noodled on it, and the manual half of this is shipped. On a running ticket, Stop unlocks the model and provider pickers, and New Session then runs under whatever you have selected — so switching from Codex to Claude partway through a ticket works now. The automatic half you hinted at — Fredrin noticing you hit a weekly limit and switching on its own — is not there yet. That needs a reliable limit-detection signal, so it is tracked separately. Thanks for the nudge!

Christian Koch, CODE K@code-K·

Awesome, thanks Jae! 👍 keep up the good works!